Friday, July 23, 2010

What is next



I have completed my city and guilds course. Here is a picture of my final piece On a Rock.




I have started my new job as a contract counselor two days a week. I am spending upwards of 30 hours a week in the studio, which is delightful.


I am having a new website designed and spending hours collecting pictures and writing text to be used. It is all worthwhile time spent and while I felt really good creating my own website two years ago this one will look much more professional.


Back in late April and with the help of Leslie Morgan from Committed to Cloth http://committedtocloth.com/ I created a one year plan for a self directed course of study. I am making good progress and up to this point am essentially using one image for the whole year. Different sizes of the image of course, but I am finding it very interesting how far this one image is taking me. I have one piece on the quilt frame (Field Flowers) and three more started (Water, Sudanese Hope and Forest).


I am going to end this post with a picture of the finished Zinnias wall haning in situ for your
viewing pleasure

Sunday, March 7, 2010

Almost completed Zinnias






This piece is 8 feet long by 30 inched high. I am just about done and wanted you to see some close up shots and the full length view.
Once it is hung in the customers home I'll post a shot of it in situ.
All the fabric is hand dyed. It has cotton batting and is completely machine stitched- a first for me.
I have two days left on my job. Then four days in Arkansas visting family. Then i am no longer working only training my replacement, counseling, grading papers and MORE ART TIME.
Talk to you soon
Karen

Wednesday, March 3, 2010

Next Work


This is the initial drawing of the next wallhanging.


This rock with moss and lichen will be placed on a background rectangle (for hanging ease)
of a forest: trees, other rocks, or water are all possiblities. I am thinking some rays of sun shinning through might be nice if i can do it. This all has to be completed by may 1 as it is the last assessment item i need to do for my City and Guilds Certificate in Patchwork and Quilting.


Here is my source picture
Here are some of the fabrics I have dyed in anticipation of creating the moss lichen strips
I am thinking of making a patchwork of 2"cut squares and triangles that i would then add texture to by embellishing with yarn, thread, etc to get the "fuzzy" look of the moss.

The cloth is ready to screen print the rock fabric all I lack is time!

Monday, February 15, 2010

Thoughts

I made good progress on my machine stitched work these past weeks. I had a lot of fears that I had to overcome. I got the flower centers completed and my assessor signed off on them. The finished size of the piece is 8 feet by 30 inches. The design is good but my technical skill in machine stitching is not as good as I would like it to be!
There are many reasons I won’t invest in the equipment to do more machine quilting- the noise of the machine makes my startle reflex heightened, it is harder on my shoulders and arms than hand work, and I don’t want to spend the money to investment in the equipment that would be necessary. Bottom line I just don’t enjoy it.
I am really committed to the hand work and while I value the skill necessary for machine quilting, hand work is an important part of my process like layering paint with a brush that has its own set of skills. I need a slower process speed. Some people have a hard time understanding this and while I agree that more “product” is always good, I don't want it to be at the expense of my process of creativity. This is me as a person that is growing. I need time to take things in think, on them and then move forward.

Thanks for listening to my thinking out loud! It helps

Wednesday, December 9, 2009

New Work


This piece is the finished product from my Shirbori class with Jan Myers-Newbury at the Nancy Crow Barn & Studio. It measures 53 x 25.5 inches and is made entirely of pieces that I clamp resisted. I keep pulling out the pole wrapped pieces I made there and toying around with ideas for another quilt top. I think I need to do some more pole wrapping first so i have a larger selection of fabrics to work with. I recently ordered some new colors and more soda ash so nothing stands in my way other than time, which we are all short of.



These two pieces are tops only. They are unquilted & unembellished and made from fabric that I hand dyed and screen printed. I used some design ideas I had done in paper for my city and guilds course as the source inspiration. The one with the circles i plan to highlight with embellishing the small yellow circles in particular so they aren't so washed out. I have some threads picked out and next time there is a lull where i am looking for some handwork these will be ready to go.
I pulled another piece of fabric out to make a third piece and decided it needed more color so I spent a couple of days screening and batching and washing. Next post i'll try and show those results.
I have a bunch of zinnia's flower centers i need to mono print soon for the commission so better get onto that next.


Saturday, December 5, 2009

Zinnias


Here is my design wall with all the fabrics I have dyed for the new piece I am preparing to make. See the post from Nov 25th to see the space in which it will hang. The full size design has 5 full flowers and 6 partial flowers. The fabrics on the left are some options for some of the partial flowers.

Here is a sample zinnia. I have stitched most of this just on the top layer. Once I added the batting and the back i stitched the final edges of the flower and leaves through all three layers. The center clearly needs a major revision.


Once i get the flowers attached to the top I think this is how I will quilt in between the flowers- parallel rows. The idea is that the yellow background will fade away and the flowers will sit on the surface. Also, since this picece will be 8.5 feet long at minimum, the less I have to twist and turn the whole thing to machine stitch with batting the easier it will be!






Wednesday, November 25, 2009

starting a new project


I am starting a new project. It is 96 inches long in total but will be hung in two sections. One section is 30 inched wide it will go on the right over the steps to the lower level and the other section is 66 inches wide it will go over the window on the left. The height of the piece is also 30 inches.
Above is the design drafted in full size on paper.
Below is the fabric dyeing in buckets in the kitchen.